Quick answer on 200 amp panel upgrades
A 200 amp panel upgrade in California is priced by the scope: the new panel and breakers, whether the meter and service equipment must be replaced, wire and grounding updates, and the permit and inspection. PG&E also has to disconnect and reconnect power, and local permit guidance says PG&E commonly takes about 2 to 4 weeks to set the meter on service changes. Get an on-site look for a written quote, and plan ahead so the work is done before Bakersfield’s summer heat.
Key facts about 200 amp panel upgrades
- Scope, not a flat number, sets the price.
- Permits and PG&E coordination are required.
- Plan ahead: PG&E meter scheduling can take weeks.
Do you actually need 200 amps?
Many older Bakersfield homes have 100 amp or smaller services. That can be fine for the house as it was built, but not for a bigger AC, an EV charger, a pool, a shop, or a remodel. Before quoting a 200 amp upgrade, we do a load check to see what your home uses and what you plan to add.
Sometimes the answer is a panel replacement at the same size, a subpanel, or a load management device instead. We only recommend 200 amps if it fits your needs.
What changes the cost
The panel and breakers are the base. On top of that, many homes have a combined meter and main panel on the outside wall, and moving to 200 amps usually means replacing that whole unit.
The service conductors from PG&E, whether overhead or underground, may need to be checked or changed to support the new size. Grounding and bonding usually need to be brought up to current requirements. Some circuits may need repairs to pass inspection, especially if we find damaged wire or work that was done without permits.
Access matters, too. A panel on an open exterior wall is a different job than one buried in a finished wall or needing stucco work.
Permits and inspection
A panel upgrade needs a building permit. The city or county inspects the work before PG&E reconnects power. Permit fees vary by jurisdiction and project, so we include the permit in your quote rather than guessing ahead of time. Our guide to Bakersfield and Kern County electrical permits explains what needs one.
PG&E coordination and timeline
PG&E has to disconnect power to replace service equipment and then set the meter on the new equipment. Local permit guidance we reviewed says that commonly takes about 2 to 4 weeks on service changes. That is why we encourage planning a panel upgrade ahead of June, when AC season and heat outages hit.
We coordinate the paperwork and the scheduling so you are not chasing it yourself.
What a written quote should include
Look for the panel, breakers, meter and service equipment if needed, grounding and bonding, permit and inspection, PG&E coordination, circuit labeling, patching, and cleanup. Ask what is excluded. A low number that leaves out the permit is not a real savings.
Signs your home has outgrown its panel
Breakers trip when the AC, dryer, and kitchen run together. Lights dim when large appliances start. The panel has no open spaces and tandem breakers have been added to squeeze in more circuits. The panel is a brand that inspectors often flag, such as Zinsco or Federal Pacific. You are planning an EV charger, a pool, a shop, or an addition.
Any of these is a good reason for a load check. It tells you whether you need 200 amps, a smaller fix, or nothing at all right now.
Next steps for a 200 amp upgrade
Call Electrical ASAP at (661) 293-0213 or request a quote online. Free estimates are available for most planned upgrades, and we confirm what is included before we schedule. See our panel upgrades page for more.
Bakersfield services for 200 amp panel upgrades
If this sounds like what you are dealing with, these service pages explain the next step.
200 amp panel upgrades FAQs
How long does a 200 amp upgrade take?
The install day is usually one day. Permits and PG&E scheduling add time. PG&E commonly takes about 2 to 4 weeks to set the meter on service changes.
Will my power be off?
Yes, during the swap. We plan the shutdown with you and PG&E.
Do I need 200 amps for an EV charger?
Not always. We do a load check first. Many homes can add a charger without a full upgrade.
Do you handle the permit?
Yes. We pull it, schedule the inspection, and coordinate with PG&E.